I attained my L3 cert on 8/9/08 and was promoted to L3 TAP on 6/22/11. Let me know how I can help you achieve your level 3 on the very first try! Glad to serve. :)
Sunday, August 3, 2008
Payload progress
I started by cutting the zippered 8" off the top of the payload section:
After fine tuning via sanding I then cut both coupler and add-on tube to length and employed the same pre-wetting technique as below on the booster: You can see down into the payload section: I left 8.5" of non-coupler length inside to accommodate the nose cone shoulder. Again I verified "squareness" of the new section with the old. Tomorrow it's gap-filling and fiberglassing.
No comments:
Post a Comment