I resumed building today, completed the following, and everything's curing in my warm garage:
Frenzy Massive:
- Designed the EBay sled template in Illustrator, traced and cut that from 1/16" G10, JBWelded brass tubing on the bottom, taped the tubes in place, and threaded into the cavity to cure in line with the 5/32" all-threads.
- Scuffed up the motor tube, marked the positions of the centering rings, and epoxied all three in place. I should note that I'm not leaving the aft-most ring free as recommended in the instructions. I'm confident that my fin mounting methods, in combination with expanding foam, will withstand even a CTI N10000.
Extreme DarkStar [Heavy]:
6 comments:
what's the fully loaded weight?
30lbs empty, 60lbs with the N1975 installed.
How much with HP included?
I think you may be underestimating...
And don't you mean "wood" add?
Well that would add 4.14 pounds.
Post a Comment