
I resumed building today, completed the following, and everything's curing in my warm garage:
Frenzy Massive:
- Designed the EBay sled template in Illustrator, traced and cut that from 1/16" G10, JBWelded brass tubing on the bottom, taped the tubes in place, and threaded into the cavity to cure in line with the 5/32" all-threads.
- Scuffed up the motor tube, marked the positions of the centering rings, and epoxied all three in place. I should note that I'm not leaving the aft-most ring free as recommended in the instructions. I'm confident that my fin mounting methods, in combination with expanding foam, will withstand even a CTI N10000.
Extreme DarkStar [Heavy]:
what's the fully loaded weight?
ReplyDelete30lbs empty, 60lbs with the N1975 installed.
ReplyDeleteHow much with HP included?
ReplyDeleteI think you may be underestimating...
ReplyDeleteAnd don't you mean "wood" add?
ReplyDeleteWell that would add 4.14 pounds.
ReplyDelete